The 9th International Anti-Corruption Conference
Building Value through Public Procurement: A Focus on Africa TABLE OF CONTENTS I. INTRODUCTION
Table 1 - Estimated Range of Public Procurement Expenditures in Africa IV. OVERVIEW OF PUBLIC PROCUREMENT SYSTEMS IN AFRICA
VI. CONCLUSION This paper will discuss both domestic and international imperatives for reform of public procurement, with specific information on the state of public procurement in selected countries in Africa.
The public procurement sector is often the largest domestic market in less developed countries. As an international agency providing technical assistance, ITC has a long history helping countries to develop their export potential and improve import operations to lower costs through improved purchasing techniques.1 The ITC experience in developing countries is that public procurement can account for up to 50%-70% of imports. Any improvements in the public procurement system can have a direct and beneficial effect on the overall economic situation of a country. And improvements are needed. One measure of this fact is the emphasis which the World Bank and regional institutions like the African Development Bank are placing on assisting developing countries to review and revise their procurement systems. Within the Africa region, over one fourth of the countries have, or will have, an active public procurement improvement program. Public procurement systems are the bridge between public requirements (e.g. roads, hospitals, defence needs, etc.) and private-sector providers. Governments provide goods and services to meet a variety of citizen-needs. These items are obtained from either internal government organisations (hospitals, public works departments, etc) or from sources external to the government in the private sector (domestic or international suppliers). In this sense, governments traditionally use their budget process to decide if they will "make" something in-house or "buy" it from others through their procurement system, just as a private company makes similar decisions in their enterprise resource plan. However, unlike private sector procurement -- public procurement is a business process within a political system -- with distinct considerations of integrity, accountability, national interest and effectiveness. The business operations of government, as controlled by public procurement systems, affect many different elements of society. First are the procuring entities which have needs for material support (e.g. roads, hospitals, desks and educational supplies, etc.) to fulfil their designated national missions. Then there is the business community of actual or potential suppliers to satisfy the government's identified requirements2 . But, for the government agency's needs to be properly considered by a supplier, they must be expressed in clear terms, compatible with public policies involving such areas such as competition, social and economic goals, and transparency of the basic rules and procedures. Procurement actions should encourage suppliers to value government business and provide satisfactory quality, service and price in good time. There are also professional associations, academic entities, and public interest groups, which have important views in how public management institutions are to perform. The general public is more likely to feel satisfaction when they know that expenditures made through the public procurement system are economical, rational and fair. A country may want to undertake public procurement reforms to support essential internal administrative improvements, to help qualify for international financing from multilateral institutions or to help integrate a country into the multilateral trading system. The core aspects of public procurement systems involve getting the right item at the right time, and at the right price, to support government actions. But, just trying to define the "right" item/time/price/etc. leads into a variety of public and private functions and political decisions (e.g. should the item come from private or public production sources, should a premium be paid to aid local manufacturers, etc.). Without a serious and sustained review of such decisions, policy makers may find that their policies are not being supported -- or are actually being undercut from within the government meant to serve them. Generating savings through procurement system improvements is done now almost routinely in the private sector, where the procurement function helps companies to respond quickly to market changes. As an example, the typical cost structure of a manufacturing firm is that for every dollar earned, around 60 cents is spent on purchased materials, 15 cents on labour, 15 cents in overhead activities, and 10 cents in profit. If, through better management of the purchasing function the cost of purchased materials were reduced by 10%, it would make a saving of 6 cents on every dollar. The result would be a 6% reduction in the total cost of the finished product. The company could make use of this saving by either reducing the sales price by 6% to compete more effectively in world markets or it could increase the company's profit from 10 cents to 16 cents: a full 60% increase! To achieve the same level of profit without reducing costs, sales would have to increase by the same 60%! It was not too long ago that the subject of public procurement would not get any attention from key decision-makers in Government. It was considered an administrative function too mundane to worry about. However, several developed countries have taken steps recently to revise their public procurement systems to improve their efficiency and generate savings. The federal government of the United States began a program to Reinvent Government in 1994. One of its first tasks was to reform the laws of the public procurement system to make it more efficient. Likewise, the United Kingdom began a study in 1998 called Efficiency in Civil Government that has resulted in several improvements for government. The government of France is developing recommendations that will also improve the efficiency of its public procurement system. In all these cases, billions of dollars have been, or are expected to be, saved through improvement actions. In addition to the general recognition that improvements in public procurement management systems will help add value to national budgets, specific international and national imperatives now exist for increased attention to public procurement. Among them are: A. World Trade Organisation Initiatives There are several international trade initiatives, which will focus on improving public procurement systems in the year 2000. Those countries that have an organised, system-wide management approach to public procurement will be able to more easily identify effective national negotiating positions. However, even where there is not yet a procurement policy- making/management infrastructure in place, high level attention to the issue can provide a basis for better negotiations on these issues. 1. Government Procurement Agreement 2. Working Group on Transparency in Government
Procurement 3. General Agreement on Trade in Services B. Support for Anti-Corruption Efforts Procurement reforms are often a key feature of anti-corruption efforts and can help promote good governance programs. Transparency in public procurement is an important matter for all countries. The member countries of the Organisation for Economic Co- operation and Development (OECD) have recently focused on improper, wasteful and corrupt activities in government, including public procurement. Developed countries have established various means to create and sustain transparency. Institutional checks and controls are likewise needed in developing countries and economies in transition. Corruption deserves special attention because it works in insidious ways. It tends to undermine the whole fabric of economic and political life. Thus, it is of extreme importance to establish and sustain correct behaviour in all procuring entities. Corruption, as defined by the World Bank 3, is the abuse of public office for private gain. Such behaviour by persons concerned with the procurement process often leads to economic losses for the public. Thus, many lose for the benefit of a few. Often there is some form of collusion between the purchasing and selling side. Responsible officials on the contracting side request -- or are induced -- to accept gratuities from bidders or contractors to make favourable award decisions. Such influence in the decision-making and executive processes of a country has legal, administrative and economic costs. Also, market-based systems work best when constructive pressure exists to change and improve pricing, quality, or performance of a product, or to otherwise satisfy customer needs. If a competitor arranges to minimise market pressures by relying on personal contacts, bribes or other means to "influence" the system, both parties are diminished. First of all, the public sector (buyer) will most likely receive a less satisfactory product to meet the public need at a price not in keeping with market forces. Second, the contractor (seller) loses initiative and energy to make its product or service more competitive (with consequent distortions of internal management and resource- allocation decisions, such as the level of research and development actually needed to maintain market share in the global marketplace). The public's trust in government to operate efficiently on its behalf is always being tested. Even with the strongest controls and the highest intentions, an organisation can suffer a breech of trust due to selfish actions of individuals. The existence of such breeches will not necessarily destroy the system, although failure to expose the wrongdoing and take corrective action will, over the long run. C. Initiatives of International Financing Institutions The World Bank is assisting countries to reform procurement procedures and streamline them to conform to internationally acceptable principles, such as those developed with the UN Agencies and Multilateral Development Banks. The World Bank systematically undertakes country procurement assessment reviews to study the national procurement procedures and practices of their borrowing countries. The Bank also supports the adoption by its borrowing countries of legislation and regulations based on the UNCITRAL Model Law for Public Procurement.Procurement is always identified as a major problem area, where cumbersome procedures slow down project execution. For the World Bank, good regulations are indispensable and should be characterised by equability, transparency and predictability. Procurement should not be a bureaucratic process, but a framework for professionals to organise their work and deliver their services efficiently. The African Development Bank is committed to assist its member countries in the implementation of structural reforms to improve public procurement systems as well as the development of intra-Africa trade. The ADB's approach to public procurement reform is to work closely with recipient governments to encourage greater investments in training to create a corps of well-trained procurement specialists. D. External Investment and Other Resource Needs Transparent procedures can help attract more investment by lowering risk. A transparent procurement system allows competing private enterprises to judge the risk of doing business with the government. They can make more realistic economic investment decisions where government procurement policies are in line with good commercial practice and public accountability requirements.International organisations and external donors also have an interest in public procurement, since control of expenditures through an accountable means is essential in explaining to their legislatures and Boards of Directors how development assistance funds were used. As foreign assistance budgets are reduced in many donor countries, there will be more pressure to ensure that recipient countries are wisely spending increasingly scarce donor resources. Those countries with inadequate controls will face increasing difficulties with donors. If a country's public procurement and accounting procedures improve, it could allow donors to grant untied aid to give more flexibility in how recipient countries spend the contributions. The need for accountability normally leads donors to impose specific procurement rules on recipient countries to ensure that generally accepted procurement practices are being followed. This can have the effect of splitting a country's professional procurement workforce into small, less efficient units as they specialise in specific procedures agreed with the donors. A more common donor approach to procurement rules could ease the burden on a country's scarce personnel resources and improve internal and external efficiencies. However, this is unlikely to happen unless there is a high level of commitment by the government to take the reform process seriously, interact with procurement experts, and implement proper decisions. E. Support for the Domestic Supplier Base Improved techniques for buying goods and services using modern quality standards and business practices can help improve the efficiency of local suppliers as they compete for government contracts. Such improvements in efficiency can enhance trade prospects by making these suppliers more acceptable vendors to global business partners. Inefficient government suppliers, on the other hand, not only provide poor value to their national government, but will be unlikely to engage in any meaningful private sector trading partnerships as the forces of global competition reduce sales opportunities. For governments, such efficiencies can directly translate into the acquisition of additional goods and services to meet national needs, funding of higher priority programs, or even reduced taxes on the public, which aid development.F. Potential for Expanded Intra-Africa Trade Traditionally, about two thirds of Sub-Saharan Africa's exports are bound for industrialised countries. In return, the region purchases around 60% of its imports from these nations. Sub-Saharan African's imports totalled US$ 76 billion in 1995, 7% of which were intra-regional. ITC is working with partner countries to boost intra-regional trade as a means of trade promotion and, consequently, the facilitation of regional development such as the Common Market for Eastern and Southern Africa (COMESA)4 .COMESA is just one of several trade agreements within Africa, but their approach to regional public procurement reform may be of interest to other groups. COMESA aims to fully integrate the countries of eastern and southern Africa into an economic union through trade and investment. COMESA's immediate aim is to achieve a Free Trade Area by October 2000 and a Customs Union in the year 2004. Currently, the members of the regional grouping are extending preferential duty rates for trade among themselves. Tariff reduction is advanced, with most members extending tariff preferences to COMESA- originating products based on 80% or 90% tariff reduction of the national tariffs. As the region gets more integrated and trade more liberalised, the need to ensure fair and open trade will be greater. COMESA has determined that in order to enhance competition in both private and public procurement arrangements, it is essential that regulations and procurement procedures be harmonised across the Free Trade Area. Alongside the reform and harmonisation of public procurement, COMESA is in the process of formulating a regional competition policy to guard against cross-border collusion, monopolistic and other unfair trade practices. Reforms to public procurement in COMESA shall also take these principles into account. III. Estimating the Size of the Procurement Market in Africa How big is the public procurement marketplace? This is a difficult question to answer with any certainty because statistics are not maintained in an easily integrated fashion. Anecdotally, we know the market is quite large. The European Union estimates that the public procurement marketplace at all levels of government in member states involves about $1,000 billion annually. The United States spends about $200 billion annually at the federal level while another $400 billion is estimated to be spent at the state and local level. Determining the level of procurement in most countries is inexact at best. Most governments do not keep good statistics. Public procurement is decentralised in many countries among many ministries and, increasingly, between central and sub-central levels of government. Because of the difficulty in judging the scope of the marketplace, ITC invited Dr. Federico Trionfetti of the London School of Economics to build on earlier research on public procurement markets to help size the potential scope of public procurement. Despite the difficulties in measurement, international comparison covering a wide set of countries is possible when one considers central government procurement only. Trionfetti found that the size of central government purchases varies between five percent (5%) and eight percent (8%) of GDP for most industrialised countries. For the Middle East and Africa, the magnitude of central government purchases ranges from between nine percent (9%) and thirteen percent (13%) of GDP. This work has provided a means for estimating the total public procurement base for Africa, when the range of percentages are applied to known estimates of GDP. Using the nominal GDP figures5 available in the World Bank publication "African Development Indicators", Table 1 indicates a range of $30 to $43 billion which could be available in the public procurement marketplace in Sub-Sahara Africa. While South Africa and Nigeria dominate the total with from $16 - $23 billion of this amount, there still could be a significant $13 - $19 billion associated with the remaining countries.
IV. Overview of Public Procurement Systems in Africa Given the significance of the resources controlled through public procurement systems and the need for improvement, the World Bank, the African Development Bank, the United Nations Development Programme (UNDP) and ITC agreed to co-sponsor a Conference on Public Procurement Reform in Abidjan, Côte d'Ivoire, (hereafter referred to as the Abidjan Conference) from 30 November to 4 December 1998. The conference was attended by procurement officials from more than 30 African countries, as well as donors and other institutions concerned with public procurement world-wide. The Abidjan Conference helped to stimulate a fresh look at procurement in many of the countries. Through questionnaires, briefings and discussion, a representative image of public procurement operations in selected African countries emerged from the Conference.The Conference provided information and insight into procurement systems in Africa in two ways:
A. Responses to the Questionnaire To help stimulate a dialog within the countries of Africa on the role and importance of public procurement, ITC developed a questionnaire to obtain some insight into the current characteristics of participants' procurement systems. The World Bank, through its Country Procurement Assessment Reviews, was the source for many of the questions. The following highlights of responses provide insight into the general state of matters affecting public procurement in Africa today.1. Legal framework and procurement methods
2. Information and transparency aspects
3. Rules of conduct and accountability 4. Preferential treatment of local bidders 5. Institutional and administrative arrangements 6. Upgrading of human resources and capacity B. Participant Descriptions of Selected Procurement Systems The Conference allowed the participants to describe for themselves their present plans and needs for building value into their national budgets through improved procurement operations. Several participants at the Conference took the opportunity to describe their efforts in reform of their public procurement systems. This information is useful in itself as a description by the countries themselves of what they feel is important. However, since there was no format or order to the presentations, placing these selected presentations within a logical framework for review of public management initiatives will enhance our understanding of how these activities can fit within an overall process of reform. The framework we are using below for this purpose was developed by ITC as part of our work in preparing a guide8 on the use of public procurement to assist small and medium enterprises (SMEs). After each of the nine elements of the policy review framework, there are examples of specific text based on the report of proceedings of the Abidjan Conference that help expand the point of the element under discussion. Such a framework could be useful in helping to articulate a nation's position and negotiation objective involving government programs.
SOUTH AFRICA UGANDA KENYA Reforms focus on addressing procurement laws (e.g., codifying laws and ensuring that tariff and procurement laws are streamlined together); establishing appropriate procurement institutions and entities; and setting-up adequate and timely evaluation and monitoring mechanisms. With an 18 to 24 month time frame, reforms will be subject to the approval and passage of legislation of the Parliament. The estimated budget appropriation for this effort is $400,000, with staff provided from the Ministry of Finance. The reforms are to create a system that includes among others, proper delegation of authority, incentives, procurement thresholds, planning, and supplies manuals.
SOUTH AFRICA UGANDA Procurement and Trade Practices: The use of international trade terms is a new phenomenon that has not taken root in the business community of Uganda. For example, INCOTERMS 9 are generally not used and understood by the private sector. Further, trade practices in public procurement are characterised by malpractice, such as over-invoicing and inadequate official documentation; Financial Framework: High interest rates hinder access to credit. Bidders also find the requirement for bid bonds at 10% of the face value of the bid to be too high, preventing them from participating in the tenders; Procurement Training System and Institutions: The procurement profession is currently not part of the Civil Service, and is not held in high regard in the country. In addition, in-service procurement training is not available domestically, which further inhibits development of a core of procurement professionals; and Procurement Procedures: Goods, services or works are obtained through public advertising locally and internationally. However, there are no standard contract documents for use in procuring goods, works or other types of contracts. The system is also segmented, with functions and decisions decentralised, and with differing rules applying to various entities. There is no single unit with the responsibility to issue, update, educate and monitor compliance with public procurement guidelines.
GUINEA
SOUTH AFRICA
UGANDA
SOUTH AFRICA The Ten Point Plan on Procurement is a series of interim interventions primarily aimed at increasing the participation of small and medium enterprises, in particular those enterprises owned by previously disadvantaged people, in public sector procurement opportunities. The 10 Point Plan (Interim Strategies) remains Government's current procurement policy while the new policy is being finalised and legislated.
10 POINT PLAN:
UGANDA
SOUTH AFRICA
UGANDA
Based on a review of the current public procurement programme,
the principal recommendations the Task Force for Public Procurement
Reform involve:
KENYA The ITC strategy for public procurement involves a multi-faceted programme to make changes that support and reinforce improvement actions. The first step we recommend is that the country undertake a comprehensive review of the present procurement system. Through this internal review, we seek to identify needed adjustments in the legal, organisational and professional resources of the country to make the system more effective. An effective international model that has been applied successfully in developed as well as developing countries has the following elements:
This approach was examined at the Abidjan Conference during a series workshops on issues related to building a reform program. Out of these workshops came a consensus on the steps needed to put in place a program for reform to build a responsive procurement management infrastructure. In addition, a sub theme of the Conference was to promote greater intra-Africa trade via public procurement among the participants. Taken together, this Abidjan Consensus Document provides a blueprint for reform in all countries.
Public procurement systems can be on opposite poles -- they can either add value to the economy or siphon it away into corrupt, wasteful or unethical purposes. Few countries - developed or undeveloped - are at either one of these poles, yet, like people, many are at some point between perfection and perdition. Because of the domestic and international imperatives that are coalescing around the function of public procurement, all governments should have a clear understanding of where their system lies on this line. The most effective way to understand the uses of a public procurement system vis-a-vis national goals and interests is to conduct a structured analysis of it. The information above, with examples from actual cases in Africa, is intended to help formulate that type of review and plan. How effectively a country can prepare and follow such a plan during the busy period ahead in the international trade community will depend on many things. But the one resource above all which will make the most difference in the task of enhancing values through improved procurement operations is a dedicated, trained, professional procurement workforce. People are needed to translate management goals and policies into reality. Throughout the world, future demands on the procurement workforce are expected to be even more critical than they are today. As the economy of a developing country grows, its procurement requirements can be expected to become more complex. If procurement is to adequately support this growth, the procurement workforce must be able to make more informed judgments about the best items available in national and global markets to satisfy requirements within the government's policies. The Conference on Public Procurement Reform in Africa , Abidjan, Côte d'Ivoire, December 1998 The Conference as a whole agreed that: Building Support for Reform - requires Political endorsement and commitment A strategy for developing enabling legislation, organisations and regulations Well trained and competent procurement officials Informed, willing and supportive business and professional sectors at both the local and international levels Demonstrating Political Commitment - is needed to effect changes and Obtain public support Obtain government staff endorsement Prioritise key elements of procurement, such as transparency, anti-corruption, etc. Promote socio-economic objectives Keep Parliament advised Reassure potential donors Obtaining Resources for Reform - is needed to help prepare a business plan to implement key objectives of the reform. Potential Sources of Funds to conduct reform are: The country's own
resources (Government and/or private sector) Potential partners to provide support for implementation of reforms are: National resources (such as public authorities, business and professional organisations) Bilateral and multilateral donor agencies International Trade Centre and other United Nations organisations to build capacity Other countries able to share information or exchange (second) staff Detailing A Strategy For Reform - is needed to address how to self-
initiate reforms (with donor assistance as needed) to
Communicating the Strategy - is needed to: Identify the leader or champion of the reform effort with the required political weight to carry out an effective program, such as the President of the country or Prime Minister or Minister of Finance Identify Stakeholders in the process and obtain their advice.
Stakeholders normally include individuals in the following areas:
Notes and References For our purposes, public procurement encompasses the process of identifying the government's requirements through to the completion of the contract. Traditionally, a need translates into a procurement requirement. The government need may be to move transports across a lake. The requirement under the contract may eventually be described as a bridge, or a ferry or a tunnel or another solution to this need which the government has determined to be the optimum approach to meet the need. Helping Countries Combat Improper, wasteful and corrupt, Poverty Reduction and Economic Management Network, The World Bank, Washington, DC September 1997. Page 8 COMESA member states are: Angola, Burundi, Comoros, the Democratic Republic of Congo, Djibouti, Egypt, Eritrea, Ethiopia, Kenya, Madagascar, Malawi, Mauritius, Namibia, Rwanda, Seychelles, Sudan, Swaziland, Tanzania, Uganda, Zambia and Zimbabwe Table 2-5. Gross domestic product, nominal; African Development Indicators 1998/99. World Bank. Washington The questionnaire results were summarised by Mr. Simeon Sahaydachny, formerly of UNCITRAL. United Nations Commission on International Trade Law (UNCITRAL) Model Law on Procurement of Goods, Construction and Services with Guide to Enactment. United Nations, New York, 1995 SME and Export-Led Growth: Are there Roles for Public Procurement Programmes?, International Trade Centre, Geneva 1999. Principle Author - Dr. John Linerelli, Aberstwyth University. International Rules for the interpretation of trade terms published by the International Chamber of Commerce, Paris, France (publication number 460) 6 Section 217 of the Constitution of the Republic of South Africa, 1996 (Act no. 108 of 1996) reads as follows: When an organ of the state in the national, provincial or local sphere of government, or any other institution identified in national legislation, contracts for goods or services, it must do so in accordance with a system which is fair, equitable, transparent, competitive and cost effective. Subsection (1) does not prevent the organs of state or institutions referred to in that subsection from implementing a procurement policy providing for:- categories of preference in the allocation of contracts; and the protection or advancement of persons, or categories of persons, disadvantaged by unfair discrimination. (3) National legislation must prescribe a framework within which the policy referred to in subsection (2) may be implemented. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||